Tuesday 2 October 2007

Final Stage of Renovation

Our home is almost up. This weekend, we have Alumix here to install the MBR cabinet.
Today, they installed the plasterboard frame. The cabinet will be 3.5m wide and ceiling height. It's gonna be a shell. In other words, we r just building the frame and inside, it shall be free style. We'll put a movable hanging rack, one aluminium shelve which we couldnt fit into the store after the renovation. It will function as a cabinet cum store room cos we are short of storage space for big bulky items. On Thurs, they will come to coat the frame with paint. Next Sat, the cabinet should be up.

Also on the same day, we got Newcoat to come to recoat our MBR toilet bathtub. Turned from blue to white to blend in with the sink and toilet bowl. They will come again another day to remove the newspapers.

Later in the afternoon, PowerGas guy came to fix the gas pipe to the cooker... yeah! Finally we can cook! It has been months since I last cooked a decent meal for the family.

Final touch up scheduled for next week -
- Curtain installation on Thurs
- Alumix door to be up on Sat
- Last of the last : carpet installation ... havent decided when to do that yet

After many months of waiting, it will not be too long before we can shift in. We have a few dates in mind... prob sometime next week :)

(Bathtub being repainted by Newcoat for $270... not a bad reno idea ...saves us the cost of hacking and now, it looks as good as new)
(MBR toilet after putting in all the barang barang)

The other toilet w/o the bathtub


Rainshower fr Hoe Kee giving us the resort feel

No comments: